c2d5b32ee2
slightly by inflating the projected top/bottom/bottom bridge surfaces before they are added into a surface. This ensures, that the possible projected infill areas merge with the perimeter supporting areas, but the perimeter supporting areas will not be inflated on their own, if there is no touching projection of a top/bottom/bottom bridge surface. |
||
---|---|---|
.. | ||
lib/Slic3r | ||
src | ||
t | ||
xsp | ||
Build.PL | ||
MANIFEST | ||
MANIFEST.SKIP |